Sediment and Erosion Control (effective August 1, 2005)
 
 
 
Plan Review Fee (per disturbed acre or portion) *This fee is for two (2) years only from the date of submission.
Land Disturbing Permit (per disturbed acre or portion)
Plan Resubmission Fee (@ 2nd and subsequent resubmissions)
Plan Renew Fee (Permit expired and renewal two more years)
Plan Renew Fee (Permit expired and renewal one more year)
$250/ac.

$250/ac.
$75
$250/ac.
 $125/ac.
Subdivision Construction Plan Review (only for Wake County)
$275/plan
 
Flood Study Reviews
 
Major Study                                                                                        (drainage area ≥100 acres – requires standard-step backwater analysis)
Minor Study                                                                                        (drainage area < 100 acres – standard-step backwater analysis not required)
$1,000/  crossing


$500/  crossing
 
Stormwater Residential
 
New and Existing Single Family Lots Exceeding Allowable % Impervious-   (Review and Permit Fee)
 
$400
 
 
Stormwater New Subdivisions
Stormwater Plan Review                                                                        (per disturbed acre or portion with a maximum 10 acres)
Stormwater Permit                                                                                (per disturbed acre or portion with a maximum 10 acres)
Plan Resubmission Fee (@ 2nd and subsequent resubmissions)
Note:  50 acres maximum charge.
 


$250/ac.

$250/ac.

$150
Stormwater Commercial (Sliding Scale)
 
  0-9   Disturbed Acres Plan Review Fee
10-19 Disturbed Acres Plan Review Fee
20-29 Disturbed Acres Plan Review Fee
30-39 Disturbed Acres Plan Review Fee
40-50 Disturbed Acres Plan Review Fee
Plan Resubmission Fee (@ 2nd and subsequent resubmissions)
Note: 50 acres maximum charge.
Stormwater Permit Fees - Same as Plan Review Fee(s) above
All charges are per disturbed acre or portion of acre.  All dollar amounts are rounded to the nearest dollar.
$250/ac.
$375/ac.
$435/ac.
$470/ac.
$485/ac.
$150