​Effective August 1, 2005, in Wake County

​ ​A. New dwellings – (single or duplex) modular homes/house moved*
​ Up to 1,200 square feet $366 per dwelling
​Over 1,200 square feet ​Add $0.20 for each additional square foot
​​Gross floor area finished within the inside perimeter of the exterior walls with no deduction for garage, corridors, stairs, closets or other features. Finished area is that portion of building served by either electrical, mechanical or plumbing systems and suitable for occupant’s use. Add $46 for temporary service pole inspections
​Multi-Family Dwelling*
​For the first unit ​$366
​For each additional unit ​$152
​Mobile Homes ​$182
​ ​B. Residential – addition (examples: bedrooms, baths, sunroom, attached garage with room above)*
​Up to 400 square feet ​$228
​Over 400 square feet ​Same as new dwelling
​ ​
C. Residential accessory structures (examples: decks, detached garages/storage buildings, porches)* ​
​Land use fee ​$46
​Plus trade fee for each trade (building, electrical, plumbing, heating) ​$46 each
​Plus square footage fee ​$0.20 per square foot
Swimming Pools, Spas, Hot Tubs​ (Any structure intended for swimming or recreational bathing with a water depth >24 inches)

$184​

Heated $46​
​ ​D. Additional fees:
​Re-inspection fee for each trip required to approve standard inspection. ​$60
​Flood certification reviews and verifications (if required) ​$50
​Inspection for temporary construction pole ​$46
​ ​
E. Onsite wastewater permits (where private onsite waste water is used)
​Improvement permit ​$200
​Land use fee ​$46
​Construction authorization (for standard gravity systems) ​$200
​Total for wastewater permit ​$466
​ ​
F. Onsite well water fee (where private onsite well water is used)
​Fee includes permit, required inspections and base water test ​$400
​ ​
​ ​G. Onsite verification of well or wastewater system location for additions and pools
​Field consultation ​$100
​ ​
​Trade Inspections*
​Building ​$46
​Electrical ​​$46
​Mechanical ​​$46
​Plumbing ​​$46
Demolition Permits
Permit and one final inspection
​$60
Non-Residential*
Based on project cost per trade.
​$ Cost ​Fee Charged
​$0-$700 ​$46
$701 - $1500​ ​$92
​$1,501-$2,500 ​$138
​$2,501-$25,000 ​$204
​$25,001-$50,000 ​$407
​$50,001-$100,000 ​$815
​$100,001-$200,000 ​$1629
​$200,001-$350,000 ​$2852
​$350,000-$500,000 ​$3768
​$500,001-$750,000 ​$5042
​$750,001-$1,000,000 ​$6314
​$1,000,000 and up ​Add .15% (multiply by .0015) of each added million dollars or portion thereof
​Administrative Fee ​$60
An administrative fee will be charged for each resubmitted site plan, inspector field consultation, permit amendment, addendum's, and construction plans requiring two or more reviews.
​Re-inspection Fee ​$60
A re-inspection fee is charged for each extra trip required to approve a standard inspection. Must be paid prior to scheduling a re-inspection.
* Structures constructed without permits will have the fees assessed at double the published amount.
  
   

Comments

This page was replaced 2/12/13.  saved for reference only

Rollup Image

 

Page Classification

Reference Information

Author

Dennis N Maidon

Department/Division

Planning, Development and Inspections
Approval Status Approved
Checked in by 'Dennis N. Maidon' using the Content and Structure Tool
Content Type: Article Page
Version: 11.0
Created at 7/2/2012 9:19 AM by Dennis N. Maidon
Last modified at 11/6/2014 11:53 AM by Stephen R. Walston
FacebookTwitterE-newslettersFlickr